

Audited annual filings, TTM ratios and consensus forward estimates
Wall Street price targets and rating actions
Revenue disaggregation per 10-K filing
Annual filings (FY) with consensus forward estimates (hatched)
1083 daily bars · split adjusted
Current price $0.0427
Latest analyst grade actions
Daily · Wilder smoothing
Classic floor pivots from 2026-10-22
Computed from daily OHLCV bars
| Indicator | Value | Type | Action |
|---|---|---|---|
| RSI (14) | 0.03 | Oscillator | Buy |
| Stochastic %K (14, 3, 3) | -0.00 | Oscillator | Buy |
| Williams %R (14) | -100.00 | Oscillator | Buy |
| MACD (12, 26, 9) | -0.01 (Hist -0.00) | Oscillator | Strong Sell |
| Average Directional Index (14) | NaN (+DI 0.0 / -DI 100.0) | Trend | Sell |
| EMA 20 | 0.05 | MA | Strong Sell |
| SMA 20 | 0.05 | MA | Strong Sell |
| EMA 50 | 0.06 | MA | Strong Sell |
| SMA 50 | 0.06 | MA | Strong Sell |
| SMA 200 | 0.08 | MA | Strong Sell |
Free float vs. closely held shares
13F institutional holdings are not available in the current data plan.
SEC Form 4 filings
Stock news · updated daily
August 25, 2026 - Vancouver, BC, Canada – TheNewswire – E ngineer Gold Mines Ltd. (the "Company") (TSX-V: EAU | OTC: EGMLF | WKN: A3EEVJ ) is pleased to announce that an infill diamond drill core sampling program is underway the TAG Property, part of its 100% owned Engineer Gold Project, located 30 kilometres southwest of Atlin in northwestern British Columbia. From 2006 to 2008, CZM Capital Corp. diamond drilled 69 holes totalling 11,524 metres along a prominent 6 km gold-silver bearing structure named the 025FZ. Several significant zones along this structure were identified, including the Main, Bearox, HW and Barney ((Fekete and Simper (2009), Fekete and Skinner (2007); ARIS reports #30931 and #29581).
August 14, 2026 – TheNewswire - Vancouver, BC, Canada – E ngineer Gold Mines Ltd. (the "Company") (TSX-V: EAU | OTC: EGMLF | WKN: A3EEVJ ) is pleased to announce the non brokered private placement first announced on May 8, 2026 is now closed. Tranche two raised $85,250 through the issue of 568,333 units at a price of $0.15 per unit. Each unit consists of one common share and one share purchase warrant. Each warrant is exercisable for a period of three years expiring August 14, 2029, at an exercise price of $0.20, subject to an acceleration clause. Acceleration would occur if, at any time after the closing date, the corporation's common shares have a closing price of $0.35 or more per share for 10 consecutive trading days on the TSX Venture Exchange, the company shall be entitled to give notice by a news release that the warrants issued pursuant to this placement will expire 30 days from the date of the news release, unless such warrants are exercised before the expiry of that period, and, in such event, all unexercised warrants will expire at 4 p.m. Pacific Time on the last day of such 30-day period. Proceeds, for tranche one and two combined, are $566,405. All securities from this tranche of the Private Placement are subject to a four month and a day hold period expiring December 15, 2026. In connection with the private placement, certain eligible persons (“ Finders ”) were paid commissions in accordance with the policies of the TSX-V. Commission for tranche two are $400 and 2,667 finder warrants exercisable for a period of three years expiring August 14, 2029, at an exercise price of $0.20, subject to acceleration clause above. Total finders commissions for tranche one and two combined are $24,132 and 160,883 finder warrants
Vancouver, BC, Canada – TheNewswire - E ngineer Gold Mines Ltd. (the "Company") (TSX-V: EAU | OTC: EGMLF | WKN: A3EEVJ ) is pleased to announce that crews, supplies and equipment have arrived on site at its 100% owned Engineer Gold Project, located 30 kilometres southwest of Atlin in northwestern British Columbia. The crews have arrived to re-establish and rehabilitate the two 20-person camps at its Engineer Mine Project and at the TAG Project in order to expand its 2026 exploration programs (see news release July 28, 2026). Both camps are already in place and fully built but have not been used since 2009 (TAG) and 2021 (Engineer). Spiro Kletas, President and CEO commented, “We are very excited to re-establish the camps at the Engineer and TAG project sites. The fact that both camps are already in place, built and paid for, is an enormous advantage for Engineer Gold Mines and our shareholders. This will allow the Company to have full teams at both sites very shortly and will enable the Company to expedite our exploration programs.”
July 28, 2026 – TheNewswire - Vancouver, BC, Canada – E ngineer Gold Mines Ltd. (the "Company") (TSX-V: EAU | OTC: EGMLF | WKN: A3EEVJ ) is pleased to announce the 2026 Phase I exploration program is underway on its 100% owned Engineer Gold Project, located 30 kilometres southwest of Atlin in northwestern British Columbia (see News Release dated April 29, 2026). This large property comprises 18,319 hectares covering a 25 kilometre long contiguous claim block and hosts the historic Engineer Gold Mine ( “Engineer” ), the TAG Property ( “TAG” ), the Wann River Prospect ( “Wann” ), plus numerous additional mineral occurrences. The first phase of the 2026 program consists of soil and rock sampling at Engineer, soil geochemistry and an in depth core review and resampling at TAG. The Company is fully permitted to follow this with a Phase II program consisting of diamond drilling, excavator trenching and induced polarization geophysical surveys in the Engineer Mine area. Phase II plans will be announced once finalized.
Reported EPS vs. consensus estimate
| Report date | EPS est. | EPS actual | Surprise | Revenue |
|---|---|---|---|---|
| Apr 30, 2026 | — | -0.00 | — | — |
SEC EDGAR filings · last 12 months
Proxy statement (DEF 14A) disclosures
TTM vs. 5-year historical average (annual ratios)
| Metric | EGMLF | Historical (5Y) / ref | Status |
|---|---|---|---|
| P/E ratio (TTM) | -4.5x | -4.2x · sector 16.6x | Discount |
| Forward P/E | — | — | n/a |
| Price / Book | 0.4x | 0.2x | Elevated |
| Price / Sales | — | — | n/a |
| EV / EBITDA | -6.7x | -7.5x | In line |
| Return on equity | -9.1% | — | Weak |
| Gross margin | 0.0% | 0.0% | n/a |
| Debt / Equity | 0.06 | 0.03 | Conservative |
| Piotroski / Altman Z | 3/9 | Z -0.25 | Distress |
Discounted cash flow model